Pic 1: Approximately 60% of the solar panels have been removed by Cerami-Browning Construction. The framework will be taken down by crane in sections.
Pic 2: Norris Steel masking off all 6' x 30' process tank bottoms for primer and paint.
Pic 3: Primered 6' x 30' process tank bottoms.
Pic 4: Norris Steel fabricating the bottoms for the 4' x 30' process tanks.
Notes: Stephens Electrical (through Cerami-Browning Construction) began installing overhead conduit in the anodizing area Monday 4/30/12. No visible changes indoors.
All the best,
dave