Monday, April 23, 2012






Pic 1: South-east looking north-west.
Pic 2: North -east looking south-west.
Pic 3: North-west looking south-east.
Pic 4: South-west looking North-east.
Pic 5: Process tank steel flooring being prepared for fabrication at Norris Steel Fabrication.
Pic 6: Some weld-ready steel channel and angle for the process tanks at Norris Steel.
Note: Noticeable changes in the anodizing area will not be apparent for a period of time. Overhead electrical and plumbing must be installed before excavation can begin.

No comments:

Post a Comment