Pics are:
1. East looking west from the middle of the building.
2. North-west looking south-east.
3. North looking south at the west wall.
4. Looking north through where the former explosion rooms were into the east side of the large warehouse.
Notes: Demolition is mostly complete. Preparing for some electrical and fire sprinkler work before excavation can begin. The upper partition wall between the anodizing line and the large north warehouse will be removed, shown in pic 4. Temporary fencing has been brought in to prepare for old solar panel removal.