Thursday, May 31, 2012



Pic 1: The first 6' x 6' x 30' process tank being delivered by Norris Steel to be water tested.
Pic 2: The fiberglass tank is being prepared to be brought into the anodizing area. Note the 2 new exhaust fan ducts installed behind the JCB.
Pic 3: Makeup air vents being installed on the south side of the anodizing area.