Pics 1 and 3: Cerami-Browning solar panel frame dis-assembly was done on the roof and brought down by lift.
Pic 2: 5 man-lifts used for installation of overhead plumbing and electrical.
Notes: 1st full tank to be assembled Friday 5/11/12. 3 full tanks to be assembled before final welding w/ special inspector.
All the best,
dave