 shows a lot of material moved to be able to accept the 20' brake tomorrow.
 shows the roll up door at the loading dock installed.  The roll up between Absolute and anodizing is also in, but not the one between the north warehouse and anodizing.
 
1 shows the fire extinguisher in with the paving done over the top. 

The pipe terminates near Beltline Road at the open pit.

 
shows the open pit and the blue pipe to the right is the one that will feed the fire extinguisher.  This work isn't supposed to start back up until Tuesday of next week, the reason is waiting on parts is what I was told.  It's likely to rain so they might have a swimming pool after the weekend.

 

shows the cover over the flume.  The railroad ties were left overs that were used to help support the trench plates in the wide gaps.  The flume is set in sand and dirt, no concrete.  The railroad ties and cover help provide weight to help prevent the flume from wanting to float.