Pic 1: The 4 electrical conduits that were too high under the slab have had the conductors removed and are in process of being lowered. Several sewer pipes were found which are being capped off and aren't needed per demolition plans.
Pic 2: TORR bathroom work still moving forward.
Pic 3: 4300 building electrical panel installed and powered up. The door framing @ the community hallway and other openings at the TORR space framed in.
Other notes: Excavation should begin next week.