Monday, September 17, 2012


Fencing installed at the concentrate storage area.

Socks being installed at the south side.

The Nascar trailer and hoist have arrived! There is minor damage to the hoist during shipment.

The Jessup equipment is stored inside the building.

Water meters are in at Beltline Road and pavement patching is complete here as well as at the former entry gate/guard shack.
The structural steel and concrete is completed for the monument to be installed on Caterpillar Road.