Monday, April 23, 2012
Pic 1: South-east looking north-west.
Pic 2: North -east looking south-west.
Pic 3: North-west looking south-east.
Pic 4: South-west looking North-east.
Pic 5: Process tank steel flooring being prepared for fabrication at Norris Steel Fabrication.
Pic 6: Some weld-ready steel channel and angle for the process tanks at Norris Steel.
Note: Noticeable changes in the anodizing area will not be apparent for a period of time. Overhead electrical and plumbing must be installed before excavation can begin.
Friday, April 13, 2012
Demolition almost complete
Pics are:
1. East looking west from the middle of the building.
2. North-west looking south-east.
3. North looking south at the west wall.
4. Looking north through where the former explosion rooms were into the east side of the large warehouse.
Notes: Demolition is mostly complete. Preparing for some electrical and fire sprinkler work before excavation can begin. The upper partition wall between the anodizing line and the large north warehouse will be removed, shown in pic 4. Temporary fencing has been brought in to prepare for old solar panel removal.
1. East looking west from the middle of the building.
2. North-west looking south-east.
3. North looking south at the west wall.
4. Looking north through where the former explosion rooms were into the east side of the large warehouse.
Notes: Demolition is mostly complete. Preparing for some electrical and fire sprinkler work before excavation can begin. The upper partition wall between the anodizing line and the large north warehouse will be removed, shown in pic 4. Temporary fencing has been brought in to prepare for old solar panel removal.
Friday, April 6, 2012
Week of April 2nd 2012
Pic 1: View from south roll up door @ loading dock looking north past bathrooms.
Pic 2: View from south roll up door looking west. Morpheus' former office and 1 partition wall removed, majority of 2nd partition wall removed. The blue wall at the far side will be the westerly end of the anodizing line. Both former Ghirmack explosion rooms still standing.
Pic 3: View from interior roll up door north of lab office looking west.
Pic 4: Pic 3 vantage point showing former Morpheus office area removed, which was from the open man door at the right to the pink paint on the left.
Pic 5: View from west wall looking east. When the former explosion rooms on the left and the partial wall beyond the man-lift on the right are removed the space will be wide open.
Pic 6: Garbage removal.
Subscribe to: