Wednesday, June 20, 2012




Pic 1: More overhead ducting and electrical conduits are being installed.
Pic 2: Some new lighting is installed, and the light produced is great.
Pic 3: Concrete cutting has begun preparing for excavation in both the anodizing area and TORR lease space.
Pic 4: Concrete forms have arrived.